Monday, 10 March 2008

Ball Mill Frame Ready for Screwing


The Ball Mill Frame put together with the rollers (They just slot easily in to the bearings inner races) and ready for Gluing and Screwing.

Note the end of the drive roller sticking through the end block. This is where I will be attaching the flexible drive coupling we made earlier.

The rollers are spaced 90mm apart in anticipation of using inexpensive 110mm plastic soil pipe and fittings to make up milling containers.

The end support blocks which also act as spacers for the frame sides are 140mm long to ensure that we get adequate clearance for the 110mm pipe and fittings.

No comments: